MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Building a framework for determining the optimal supplier shipping performance

Author(s)
Hurd, Maximilian L. (Maximilian Lawrence); J. van Rensburg, Izak W
Thumbnail
DownloadFull printable version (8.820Mb)
Other Contributors
Massachusetts Institute of Technology. Engineering Systems Division.
Advisor
Bruce Arntzen.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
Most companies aim for perfect on-time delivery from suppliers, since late deliveries can cause supply disruptions and raise the cost of inventory, transportation and coordination. But this assumes that companies do not incur expenses in increasing or maintaining supplier performance. Our thesis looks at the problem faced by those companies that do invest in suppliers to help them achieve a desired performance level. In these special cases, a perfect target may no longer yield the minimum cost incurred over a performance spectrum. Our thesis provides a framework that companies can use to determine an optimal target for timely deliveries by comparing the cost implications of different supplier performance levels. We pursue an empirical approach, using the data and metrics of an industrial equipment manufacturer that uses a hit-or-miss performance measure to evaluate on-time supplier deliveries. Within the scope of this performance management system, we determine the relevant cost categories. Using regression analysis, we create models projecting each category's expected behavior based on data we collect. Combining the models allows us to calculate a system optimal point at which the incremental cost of supplier development towards an improved performance target matches the benefit derived from avoided supply disruption. This performance target minimizes the total cost of the performance management system. While our framework is calibrated to a specific company, the models we create are general enough to be adapted by companies facing similar problems. By laying out our treatment of costs, we hope to make it feasible for other companies to calculate a target that makes sense: one that suppliers can achieve and purchasers can afford.
Description
Thesis (M. Eng. in Logistics)--Massachusetts Institute of Technology, Engineering Systems Division, 2012.
 
Cataloged from PDF version of thesis.
 
Includes bibliographical references (p. 67-69).
 
Date issued
2012
URI
http://hdl.handle.net/1721.1/77463
Department
Massachusetts Institute of Technology. Engineering Systems Division
Publisher
Massachusetts Institute of Technology
Keywords
Engineering Systems Division.

Collections
  • Graduate Theses
  • SCALE Research Reports

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.