dc.contributor.advisor | C. B. Breed. | en_US |
dc.contributor.author | Kalman, Jack R | en_US |
dc.date.accessioned | 2007-01-10T16:15:55Z | |
dc.date.available | 2007-01-10T16:15:55Z | |
dc.date.issued | 1933 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.1/35476 | |
dc.description | Thesis (B.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1933. | en_US |
dc.description | MICROFICHE COPY AVAILABLE IN ENGINEERING. MIT copy bound with: A study of the relation between altitude and precipitation for New England / Charles Theodore Bradley. | en_US |
dc.description | Includes bibliographical references (leaf 73). | en_US |
dc.description.statementofresponsibility | by Jack R. Kalman. | en_US |
dc.format.extent | 73, [2] leaves | en_US |
dc.format.extent | 5601873 bytes | |
dc.format.extent | 5601677 bytes | |
dc.format.mimetype | application/pdf | |
dc.format.mimetype | application/pdf | |
dc.language.iso | eng | en_US |
dc.publisher | Massachusetts Institute of Technology | en_US |
dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | |
dc.subject | Civil and Environmental Engineering | en_US |
dc.title | Construction methods used on the East Boston Traffic Tunnel under Boston Harbor | en_US |
dc.type | Thesis | en_US |
dc.description.degree | B.S. | en_US |
dc.contributor.department | Massachusetts Institute of Technology. Department of Civil and Environmental Engineering | |
dc.identifier.oclc | 36048842 | en_US |