MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Open Access Articles
  • MIT Open Access Articles
  • View Item
  • DSpace@MIT Home
  • MIT Open Access Articles
  • MIT Open Access Articles
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Need and Opportunities for a ‘Plan B’ in Rail Track Inspection Schedules

Author(s)
Osman, Mohd Haniff Bin; Jack, Anson; Kaewunruen, Sakdirat; Sussman, Joseph M
Thumbnail
DownloadSussman_Need and opportunities.pdf (165.0Kb)
PUBLISHER_CC

Publisher with Creative Commons License

Creative Commons Attribution

Terms of use
Creative Commons Attribution-NonCommercial-NoDerivs License http://creativecommons.org/licenses/by-nc-nd/4.0/
Metadata
Show full item record
Abstract
Track inspection is purposely performed to recover tracks from defects and damage and eliminate potential safety hazards. It is scheduled through an exhaustive process that usually integrates many disciplines such as optimization, statistics, risk management, etc. Spending so much of a monetary and an emotional investment in an original schedule (referred to as master schedule hereafter) that the scheduler wants to deliver might be a good excuse not to develop a solid ‘Plan B’. Plan B here refers to scheduler responses or a contingency plan when the master schedule does not go as expected. It is found that there is often low to moderate probability of a crisis occurring when a schedule is executed in a real environment. Nevertheless, its impact can leave transportation services to the mercy of the disruption as shown by the Christmas 2014 incident where a huge volume of passengers using King's Cross and Paddington services experienced both inconvenience and discomfort due to engineering delays and train disruption. Thus, this paper aims to discuss the potential of considering ‘Plan B’ or contingency plan if incidents arise that were not expected during track inspection schedule execution. Benefits, general guidelines and relevant strategies for creating a contingency plan are also discussed. We highlight the rationale to support the claim that an original schedule of track inspection jobs should be adapted to respond to a new context e.g. inspection vehicle machine breakdown, new inspection requests, man-made hazards, terrorist attack, extreme weather, climate change, etc. It is however proposed to develop an appropriate set of performance measure that is used to guide rescheduling in track inspection due to financial, equipment inventory, manpower, safety regulations, time and spatial constraints.
Date issued
2016-10
URI
http://hdl.handle.net/1721.1/110654
Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Journal
Procedia Engineering
Publisher
Elsevier
Citation
Osman, Mohd Haniff Bin, Sakdirat Kaewunruen, Anson Jack, and Joseph Sussman. “Need and Opportunities for a ‘Plan B’ in Rail Track Inspection Schedules.” Procedia Engineering 161 (2016): 264–268.
Version: Final published version
ISSN
18777058

Collections
  • MIT Open Access Articles

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.