Resource scheduling and planning for tunneling with a new resource model of the Decision Aids for Tunneling (DAT)
Author(s)
Min, Sangyoon; Einstein, Herbert H
DownloadResource Scheduling and Planning for Tunneling with a New Resource Model of the Decision Aids for Tunneling.pdf (1.518Mb)
PUBLISHER_CC
Publisher with Creative Commons License
Creative Commons Attribution
Terms of use
Metadata
Show full item recordAbstract
Resource scheduling and planning are the strategies required to determine the sequence of activities and resource allocation during tunnel construction. Resource scheduling and planning have been implemented in a new resource model of the Decision Aids for Tunneling (DAT), which are a computer based tool used to simulate tunnel construction. Tunneling plans obtained with the new resource model of the DAT take into account the technical precedence of activities, the resource/space availability, the dynamic status of the process, and the work continuity. In particular, the new resource model of the DAT can provide the optimal tunneling plan, which produces the shortest construction time and the smallest construction cost, and satisfies the special characteristics of tunnel construction such as excavation methods, distance requirements between the headings, and preempting activities (e.g., blasting).
The paper attempts to contribute to both theory and practice: Optimization of the construction process considering time, cost and resources is particularly complicated in tunneling where activities and resource availability have to be appropriately sequenced and interference has to be avoided. The paper addresses this fundamental problem with the development of different schematic tunneling plans that consider the relevant activities and optimizes them with regard to overall cost and time, also considering uncertainties. Equally important is to make the theoretical development practically useable. This is done through implementation of the resource optimization in the DAT and, very importantly, by demonstrating the practical use with an application to a real tunnel case. Keywords
Resource optimization
DAT
Decision Aids
Resource model
Date issued
2015-11Department
Massachusetts Institute of Technology. Department of Civil and Environmental EngineeringJournal
Tunnelling and Underground Space Technology
Publisher
Elsevier
Citation
Min, Sangyoon, and Einstein, Herbert H. “Resource Scheduling and Planning for Tunneling with a New Resource Model of the Decision Aids for Tunneling (DAT).” Tunnelling and Underground Space Technology 51 (January 2016): 212–225 © 2015 Elsevier Ltd
Version: Author's final manuscript
ISSN
0886-7798