MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Open Access Articles
  • MIT Open Access Articles
  • View Item
  • DSpace@MIT Home
  • MIT Open Access Articles
  • MIT Open Access Articles
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Integrated Planning for Design and Production in Two-Stage Recycling Operations

Author(s)
Chang, Jiyoun Christina; Graves, Stephen C; Kirchain Jr, Randolph E; Olivetti, Elsa A.
Thumbnail
DownloadMain article to be published (1.137Mb)
Open Access Policy

Open Access Policy

Creative Commons Attribution-Noncommercial-Share Alike

Alternative title
Integrated planning for design and production in two-stage recycling operations
Terms of use
Creative Commons Attribution-NonCommercial-NoDerivs License http://creativecommons.org/licenses/by-nc-nd/4.0/
Metadata
Show full item record
Abstract
Recycling is a key strategy to reduce the environmental impact associated with industrial resource use. Recent improvements in materials recovery technologies offer the possibility for recouping additional value from recycling. However, incorporation of secondary raw materials into production may be constrained by operational complexity in two-stage blending processes. In this paper, we derive an analytical solution to demonstrate the importance of integrated planning (IP) approaches for two-stage blending operations in recycling. Our results suggest that the quality of materials obtained from the first stage strongly influences performance in the second stage. Current disjointed planning (DP) approaches in the recycling industry, where individual stages are independently planned without decision-making about intermediate blend design, overlook this interaction and, therefore, make conservative use of lower quality materials. We develop an IP model using a formulation of the pooling problem and apply it to an industrial-scale aluminum recycling facility located in Europe. The results suggest that the IP model can reduce material costs by more than 5%, for the case examined, and can enable increased use of undervalued raw materials. This study also investigates the impact of variations in operational conditions on the benefits of IP. Keywords: Production; Material recycling; Integrated planning; Two-stage blending process (pooling problem); Design of intermediate products
Date issued
2018-08
URI
https://hdl.handle.net/1721.1/123987
Department
Massachusetts Institute of Technology. Department of Materials Science and Engineering; Sloan School of Management; MIT Materials Research Laboratory
Journal
European Journal of Operational Research
Publisher
Elsevier BV
Citation
Chang, Jiyoun C. et al. "Integrated planning for design and production in two-stage recycling operations." European Journal of Operational Research, 273, 2 (March 2019): 535-547.
Version: Author's final manuscript
ISSN
0377-2217

Collections
  • MIT Open Access Articles

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.