| dc.contributor.author | Moghaddass, Ramin | |
| dc.contributor.author | Ertekin, Şeyda | |
| dc.date.accessioned | 2021-09-20T17:30:47Z | |
| dc.date.available | 2021-09-20T17:30:47Z | |
| dc.date.issued | 2018-01-04 | |
| dc.identifier.uri | https://hdl.handle.net/1721.1/131881 | |
| dc.description.abstract | Abstract
We study a single-unit deteriorating system under condition monitoring for which collected signals are only stochastically related to the actual level of degradation. Failure replacement is costlier than preventive replacement and there is a delay (lead time) between the initiation of the maintenance setup and the actual maintenance, which is closely related to the process of spare parts inventory and/or maintenance setup activities. We develop a dynamic control policy with a two-dimensional decision space, referred to as a warning-replacement policy, which jointly optimizes the replacement time and replacement setup initiation point (maintenance ordering time) using online condition monitoring data. The optimization criterion is the long-run expected average cost per unit of operation time. We develop the optimal structure of such a dynamic policy using a partially observable semi-Markov decision process and provide some important results with respect to optimality and monotone properties of the optimal policy. We also discuss how to find the optimal values of observation/inspection interval and lead time using historical condition monitoring data. Illustrative numerical examples are provided to show thatour joint policy outperforms conventional suboptimal policies commonly used in theliterature. | en_US |
| dc.publisher | Springer US | en_US |
| dc.relation.isversionof | https://doi.org/10.1007/s10479-017-2745-3 | en_US |
| dc.rights | Article is made available in accordance with the publisher's policy and may be subject to US copyright law. Please refer to the publisher's site for terms of use. | en_US |
| dc.source | Springer US | en_US |
| dc.title | Joint optimization of ordering and maintenance with condition monitoring data | en_US |
| dc.type | Article | en_US |
| dc.contributor.department | Sloan School of Management | |
| dc.eprint.version | Author's final manuscript | en_US |
| dc.type.uri | http://purl.org/eprint/type/JournalArticle | en_US |
| eprint.status | http://purl.org/eprint/status/PeerReviewed | en_US |
| dc.date.updated | 2020-09-24T21:39:00Z | |
| dc.language.rfc3066 | en | |
| dc.rights.holder | Springer Science+Business Media, LLC, part of Springer Nature | |
| dspace.embargo.terms | Y | |
| dspace.date.submission | 2020-09-24T21:39:00Z | |
| mit.license | PUBLISHER_POLICY | |
| mit.metadata.status | Authority Work and Publication Information Needed | |