Show simple item record

dc.contributor.authorMuzhikyan, Aramazd
dc.contributor.authorFarid, Amro M
dc.contributor.authorYoucef-Toumi, Kamal
dc.date.accessioned2022-07-05T12:59:36Z
dc.date.available2021-10-27T20:05:13Z
dc.date.available2022-07-05T12:59:36Z
dc.date.issued2017
dc.identifier.urihttps://hdl.handle.net/1721.1/134486.2
dc.description.abstract© 2016 Elsevier Ltd Power balance is one of the key requirements for reliable power system operation. However, factors, such as net load variability and forecast errors, impose practical limitations on matching the scheduled generation and the real-time demand. Normally, potential power imbalances are mitigated by scheduling additional generation capacity called operating reserves. However, reserves are a costly commodity and their requirements should be accurately assessed to avoid unnecessary expense. Currently, the reserve requirements are determined using a posteriori methods based upon operator's experience and established assumptions. While these assumptions are made out of a level of engineering practicality, they may not be formally true given the numerical evidence. This paper presents a formal mathematical framework for the a priori determination of three types of operating reserve requirements, namely load following, ramping and regulation. Validation of the methodology is performed by a set of extensive simulations that model the power system operations for different scenarios. This methodology is used to study the sensitivity of each type of reserve requirement to the net load and power system parameters.en_US
dc.language.isoen
dc.publisherElsevier BVen_US
dc.relation.isversionof10.1016/J.IJEPES.2016.09.005en_US
dc.rightsCreative Commons Attribution-NonCommercial-NoDerivs Licenseen_US
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/en_US
dc.sourceMIT web domainen_US
dc.titleAn a priori analytical method for the determination of operating reserve requirementsen_US
dc.typeArticleen_US
dc.identifier.citationMuzhikyan, Aramazd, Amro M. Farid, and Kamal Youcef-Toumi. "An a Priori Analytical Method for the Determination of Operating Reserve Requirements." International Journal of Electrical Power and Energy Systems 86 (2017): 1-17.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineeringen_US
dc.relation.journalInternational Journal of Electrical Power and Energy Systemsen_US
dc.eprint.versionAuthor's final manuscripten_US
dc.type.urihttp://purl.org/eprint/type/JournalArticleen_US
eprint.statushttp://purl.org/eprint/status/PeerRevieweden_US
dc.date.updated2019-09-26T16:35:57Z
dspace.orderedauthorsMuzhikyan, A; Farid, AM; Youcef-Toumi, Ken_US
dspace.date.submission2019-09-26T16:35:58Z
mit.journal.volume86en_US
mit.metadata.statusPublication Information Neededen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

VersionItemDateSummary

*Selected version