Show simple item record

dc.contributor.authorEash-Gates, Philip
dc.contributor.authorKlemun, Magdalena M.
dc.contributor.authorKavlak, Goksin
dc.contributor.authorMcNerney, James M
dc.contributor.authorBuongiorno, Jacopo
dc.contributor.authorTrancik, Jessika
dc.date.accessioned2021-10-19T15:55:54Z
dc.date.available2021-10-19T15:55:54Z
dc.date.issued2020-11
dc.date.submitted2020-08
dc.identifier.issn2542-4351
dc.identifier.urihttps://hdl.handle.net/1721.1/133049
dc.description.abstract© 2020 Elsevier Inc. Nuclear plant costs in the US have repeatedly exceeded projections. Here, we use data covering 5 decades and bottom-up cost modeling to identify the mechanisms behind this divergence. We observe that nth-of-a-kind plants have been more, not less, expensive than first-of-a-kind plants. “Soft” factors external to standardized reactor hardware, such as labor supervision, contributed over half of the cost rise from 1976 to 1987. Relatedly, containment building costs more than doubled from 1976 to 2017, due only in part to safety regulations. Labor productivity in recent plants is up to 13 times lower than industry expectations. Our results point to a gap between expected and realized costs stemming from low resilience to time- and site-dependent construction conditions. Prospective models suggest reducing commodity usage and automating construction to increase resilience. More generally, rethinking engineering design to relate design variables to cost change mechanisms could help deliver real-world cost reductions for technologies with demanding construction requirements. Nuclear power plants provide roughly half of the low-carbon electricity in the US. However, projections of nuclear plant costs have repeatedly failed to predict the cost overruns observed since the 1960s. We study the mechanisms that have contributed to the rise in nuclear construction costs over the past 5 decades to understand the divergence between expected and realized costs. We find that nth-of-a-kind plants in the US have been more expensive than first-of-a-kind plants, with “soft” factors external to reactor hardware contributing over half of the cost increase between 1976 and 1987. Costs of the reactor containment building more than doubled, primarily due to declining on-site labor productivity. Productivity in recent US plants is up to 13 times lower than industry expectations. A prospective analysis of the containment building suggests that improved materials and automation could increase the resilience of nuclear construction costs to variable conditions. We study nuclear plant costs in the US over the past 5 decades to understand the mechanisms that contributed to cost escalation and the repeated underestimation of construction cost. We show that declining labor productivity and “soft” costs were leading contributors. Counter to expectation, nth-of-a-kind plants have been more expensive than first-of-a-kind plants. Our prospective analysis of the containment building suggests that the cost resilience of nuclear construction could be increased through improved materials and automation.en_US
dc.language.isoen
dc.publisherElsevier BVen_US
dc.relation.isversionofhttp://dx.doi.org/10.1016/j.joule.2020.10.001en_US
dc.rightsCreative Commons Attribution-NonCommercial-NoDerivs Licenseen_US
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/en_US
dc.sourceProf. Buongiornoen_US
dc.titleSources of Cost Overrun in Nuclear Power Plant Construction Call for a New Approach to Engineering Designen_US
dc.typeArticleen_US
dc.identifier.citationEast-Gates, Philip et al. "Sources of Cost Overrun in Nuclear Power Plant Construction Call for a New Approach to Engineering Design" Joule 4, 11 (November 2020): 2348-2373. © 2020 Elsevier Inc.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Institute for Data, Systems, and Societyen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Nuclear Science and Engineeringen_US
dc.relation.journalJouleen_US
dc.eprint.versionAuthor's final manuscripten_US
dc.type.urihttp://purl.org/eprint/type/JournalArticleen_US
eprint.statushttp://purl.org/eprint/status/PeerRevieweden_US
dc.date.updated2021-10-19T13:25:27Z
dspace.orderedauthorsEash-Gates, P; Klemun, MM; Kavlak, G; McNerney, J; Buongiorno, J; Trancik, JEen_US
dspace.date.submission2021-10-19T13:25:28Z
mit.journal.volume4en_US
mit.journal.issue11en_US
mit.licensePUBLISHER_CC
mit.metadata.statusCompleteen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record