MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Open Access Articles
  • MIT Open Access Articles
  • View Item
  • DSpace@MIT Home
  • MIT Open Access Articles
  • MIT Open Access Articles
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Track maintenance scheduling and its interactions with operations: Dedicated and mixed high-speed rail (HSR) scenarios

Author(s)
Sussman, Joseph M.; Teixeira, Paulo; Pouryousef, Hamed
Thumbnail
DownloadSussman_Track Maintenance.pdf (294.1Kb)
PUBLISHER_POLICY

Publisher Policy

Article is made available in accordance with the publisher's policy and may be subject to US copyright law. Please refer to the publisher's site for terms of use.

Terms of use
Article is made available in accordance with the publisher's policy and may be subject to US copyright law. Please refer to the publisher's site for terms of use.
Metadata
Show full item record
Abstract
HSRs are a complex system not only in terms of technical specifications, but also with respect to operations and maintenance over the track structure. Also, track structure is basically considered as the most important and costly railway asset. Its maintenance is vital to assure safety and operating practices are also of great importance to assure that a good level of service is provided. Considering track maintenance considerations over a new HSR line, one important and critical feature is the operational regime and the question of whether the line will be operated as mixed (passenger and freight) or dedicated only to passenger traffic. This can influence the maintenance patterns: preventive maintenance planning, maintenances scheduling and assignment issues. This will be different for the dedicated and mixed HSR traffic scenarios. In this research, the main approach is focused on the interactions between track maintenance planning and operational concerns and influences in these two scenarios. With this aim and within the current paper, a model of the preventive maintenance scheduling problem (PMSP) has been selected initially from Budai (2006) and then an upgraded revision of this model (Multi-segment assignment and scheduling of preventive maintenance problem) is introduced. Furthermore, the upgraded model of PMSP has been run over a given HSR line (Tehran-Qom HSR corridor in Iran) based on the comparison between the two scenarios of dedicated HSR and upgraded mixed HSR patterns. The main requirements, similarities and differences between these two scenarios are analyzed based on preventive maintenance scheduling and assignment requisites and interactions over the operating restrictions and considerations such as track possession patterns for maintenance activities. We conclude that decision making between these two scenarios through PMSP modeling are quite complicated and depends on the technical and operational specifications of the given HSR corridor, although some general comments on tradeoffs are possible.
Date issued
2010-04
URI
http://hdl.handle.net/1721.1/66602
Department
Massachusetts Institute of Technology. Engineering Systems Division
Journal
Proceedings of the 2010 Joint Rail Conference
Publisher
ASME
Citation
Pouryousef, Hamed, Paulo Teixeira, and Joseph Sussman. “Track Maintenance Scheduling and Its Interactions With Operations: Dedicated and Mixed High-Speed Rail (HSR) Scenarios.” ASME, 2010. 317-326. Web. 27 Oct. 2011. © 2010 ASME
Version: Final published version
ISBN
978-0-7918-4907-1

Collections
  • MIT Open Access Articles

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.