Show simple item record

dc.contributor.authorSussman, Joseph M.
dc.contributor.authorTeixeira, Paulo
dc.contributor.authorPouryousef, Hamed
dc.date.accessioned2011-10-27T18:15:48Z
dc.date.available2011-10-27T18:15:48Z
dc.date.issued2010-04
dc.identifier.isbn978-0-7918-4907-1
dc.identifier.urihttp://hdl.handle.net/1721.1/66602
dc.description.abstractHSRs are a complex system not only in terms of technical specifications, but also with respect to operations and maintenance over the track structure. Also, track structure is basically considered as the most important and costly railway asset. Its maintenance is vital to assure safety and operating practices are also of great importance to assure that a good level of service is provided. Considering track maintenance considerations over a new HSR line, one important and critical feature is the operational regime and the question of whether the line will be operated as mixed (passenger and freight) or dedicated only to passenger traffic. This can influence the maintenance patterns: preventive maintenance planning, maintenances scheduling and assignment issues. This will be different for the dedicated and mixed HSR traffic scenarios. In this research, the main approach is focused on the interactions between track maintenance planning and operational concerns and influences in these two scenarios. With this aim and within the current paper, a model of the preventive maintenance scheduling problem (PMSP) has been selected initially from Budai (2006) and then an upgraded revision of this model (Multi-segment assignment and scheduling of preventive maintenance problem) is introduced. Furthermore, the upgraded model of PMSP has been run over a given HSR line (Tehran-Qom HSR corridor in Iran) based on the comparison between the two scenarios of dedicated HSR and upgraded mixed HSR patterns. The main requirements, similarities and differences between these two scenarios are analyzed based on preventive maintenance scheduling and assignment requisites and interactions over the operating restrictions and considerations such as track possession patterns for maintenance activities. We conclude that decision making between these two scenarios through PMSP modeling are quite complicated and depends on the technical and operational specifications of the given HSR corridor, although some general comments on tradeoffs are possible.en_US
dc.language.isoen_US
dc.publisherASMEen_US
dc.relation.isversionofhttp://dx.doi.org/10.1115/JRC2010-36125en_US
dc.rightsArticle is made available in accordance with the publisher's policy and may be subject to US copyright law. Please refer to the publisher's site for terms of use.en_US
dc.sourceASMEen_US
dc.titleTrack maintenance scheduling and its interactions with operations: Dedicated and mixed high-speed rail (HSR) scenariosen_US
dc.typeArticleen_US
dc.identifier.citationPouryousef, Hamed, Paulo Teixeira, and Joseph Sussman. “Track Maintenance Scheduling and Its Interactions With Operations: Dedicated and Mixed High-Speed Rail (HSR) Scenarios.” ASME, 2010. 317-326. Web. 27 Oct. 2011. © 2010 ASMEen_US
dc.contributor.departmentMassachusetts Institute of Technology. Engineering Systems Divisionen_US
dc.contributor.approverSussman, Joseph M.
dc.contributor.mitauthorVanderploeg, Joseph M.
dc.contributor.mitauthorTeixeira, Paulo
dc.contributor.mitauthorPouryousef, Hamed
dc.relation.journalProceedings of the 2010 Joint Rail Conferenceen_US
dc.eprint.versionFinal published versionen_US
dc.type.urihttp://purl.org/eprint/type/ConferencePaperen_US
dspace.orderedauthorsPouryousef, Hamed; Teixeira, Paulo; Sussman, Josephen
dspace.mitauthor.errortrue
mit.licensePUBLISHER_POLICYen_US
mit.metadata.statusComplete


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record